Home FUNCTIONALITY LONG LEADS
Waterproof BioThane Long Lead | Brass Hardware

Waterproof BioThane Long Lead | Brass Hardware

$ 44.62

$ 0.00

Unavailable
Waterproof BioThane Long Lead | Brass Hardware

Waterproof BioThane Long Lead | Brass Hardware

$ 44.62

$ 0.00

Size:
  • 15-Foot
  • 20-Foot
  • 30-Foot
Unavailable
Please select combo product attributes
The combo subtotal is $,SAVE$

Product Details

Backwoods Dog 5/8" Waterproof BioThane Dog Long Lead | Brass Hardware

Long leads or recall leads are the perfect tool to aid in your dog's training. BioThane waterproof vegan leather webbing makes this the most durable and mess??proof line you can buy! No matter the terrain or weather conditions this long lead will allow your dog to run further from your side and still have a safe link to you??and the best part? It's 100% waterproof, stink-proof and washable!

Handmade from authentic?Beta 520 Standard BioThane, our leashes have the look and feel of leather without the maintenance. Stink-proof, waterproof, washable, and soft to the touch. Highly durable and maintains flexibility even in extremely cold weather. It will outlast other leash materials, available in a rainbow of bright and earthy colours, and it's vegan!

Rugged dog gear for every adventure. Built tough to last. Proudly made in the ??backwoods?? of Ontario, Canada.?

Features:

  • 5/8-Inch Wide Beta 520 Standard?BioThane? Webbing
  • 5/8-Inch?Trigger Hook:?Silver or Dark Chrome
  • 5/8-Inch Welded D-ring
  • 100% Waterproof
  • 100% Stinkproof
  • 100% Vegan

*Pictured in:?Olive.?If you need help finding the right colour, please contact us at: [email protected]

?

You May Also Like

Cart
Canine Luxe Co. | Luxury Dog Collars, Leather Leashes & Premium Harnesses
Your cart is currently empty.